Construction Status - October 15, 2006


Page 1 / 2
Most of the windows are in, doors next Front porch pine T&G ceiling Front porch view to the vineyard
Most of the windows are in, doors next Front porch pine T&G ceiling Front porch view to the vineyard
Dormer windows installed Electrical coming in from the roof Catwalk joists begun
Dormer windows installed Electrical coming in from the roof Catwalk joists begun
Coming around to the other side Lighting wires run on purlin downside Ceiling fan rough-in
Coming around to the other side Lighting wires run on purlin downside Ceiling fan rough-in