Construction - April 14, 2007


Page 1 / 2
Four posts done The newel post assembly line George filming Shannon the painter
Four posts done The newel post assembly line George filming Shannon the painter
Newel post with Danish oil applied Step 1 - crosscut the 4x6 Cut to the proper depth
Newel post with Danish oil applied Step 1 - crosscut the 4x6 Cut to the proper depth
After a run through the table saw Need to sawzall the last piece Bulk removed
After a run through the table saw Need to sawzall the last piece Bulk removed
 [Next >>]

Back to the Blog