« Construction Daily | Main | Construction Daily » August 28, 2006Construction DailyWork continued on leveling the basement framing. Initial framing only secures the bottom of each wall to the slab, and connect each wall together, but the tops of the walls are left loose until the subfloor deck is finished. Then the crew comes back through the basement and levels and squares each wall, as well as the subfloor (shimming up etc.) Posted by Stephen at August 28, 2006 7:57 AM |
|