« Viogner Bottling | Main | Construction Daily » November 6, 2006Construction DailyThe plumbers started installing the PVC in the basement today. Ron and Fred (plumber) called me and indicated that the sink placement we struggled with and thought we had figured out would not pass code. The drain has to be 15" off of at least one finished wall. Looks I have to go out to the site tomorrow night after work and re-figure it out, as Fred needs the answer by Wednesday morning. They also installed the star window today! :) Posted by Stephen at November 6, 2006 3:21 PM |
|