« Construction Daily | Main | Construction Daily » March 24, 2007Construction DailyHuge day today. Grouted the boy's bathroom, installed the base cove in our bathroom, and got the kitchen grouted. Grouting the bathroom was a piece of cake, but the kitchen was much much more challenging. I think the difference was that the bathroom tile had a rougher edge which naturally hides a lot of the grout oddities, whereas the kitchen tile has perfectly beveled edges so every little bump or dip in the grout lines. So it took a lot longer to try and get them all evened out. Anyhow I got done pretty late and just walked away and left a big mess to clean up tomorrow! Daily hours = 11 Posted by Stephen at March 24, 2007 10:00 PM |
|
Notaviva Vineyards, LLC
13274 Sagle Rd
Purcellville, VA 20132
Tel: (540) 668-6756
Copyright © 2007-2011 Notaviva Vineyards, LLC
NOTAVIVA® and WINE PAIRED WITH MUSIC. POUR. LISTEN. BELIEVE.®
are registered trademarks of Notaviva Vineyards LLC.
Unauthorized use is strictly prohibited.

Learn more about doing business
in Loudoun County, Virginia