« Construction Daily | Main | Construction Daily » March 27, 2007Construction DailyTrevor has been spending a few days building up the winery site to ensure proper water runoff around the site. Ron actually got a call from a buddy who was looking to get rid of some fill dirt from a construction site east of Leesburg. So we ended up getting about 30 dump trucks of dirt which we used to build up the pad. Inside, I got the boy's tub grouted, and then tiled the shower in the master suite. Grouting sucks, and at this point I can honestly say I've gotten tiling out of my system. On the sub front, the electricians have been "switching and plugging" and getting wires tied into the fuse panel in the basement. Vernon and Tim have been working on trimming the tasting room and catwalk, and we've got some great looking baseboard to show for it. Daily hours = 10 Posted by Stephen at March 27, 2007 10:53 PM |
|
Notaviva Vineyards, LLC
13274 Sagle Rd
Purcellville, VA 20132
Tel: (540) 668-6756
Copyright © 2007-2011 Notaviva Vineyards, LLC
NOTAVIVA® and WINE PAIRED WITH MUSIC. POUR. LISTEN. BELIEVE.®
are registered trademarks of Notaviva Vineyards LLC.
Unauthorized use is strictly prohibited.

Learn more about doing business
in Loudoun County, Virginia