« Construction Daily | Main | Construction Daily » April 14, 2007Construction DailyToday started with a bit of fun. Got to head down to the Ferguson showroom to pick out some plumbing fixtures - faucets for the master suite, toilets for the tasting room, and floor drains / plumbing for the floor of the winery. Any kind of shopping is more fun than grouting floors! Had to check in with Shannon a few times as I was figuring out what to get, but after an hour or so I had the order placed and was heading back to the house to work on newel posts. Creating the posts is becoming more efficient as I develop little shortcuts and methods, and they are quite consistent. Check out the pics to see my assembly line (our bedroom...) Meanwhile Shannon was getting the first coat of paint on the boy's room (blue) and the spare bedroom (sage green). She was able to put in a full day while the Grammies took turns watching the boys. It's great to see the rooms coming to life with the color! Daily hours (S&S combined) = 18 Posted by Stephen at April 14, 2007 12:01 AM |
|
Notaviva Vineyards, LLC
13274 Sagle Rd
Purcellville, VA 20132
Tel: (540) 668-6756
Copyright © 2007-2011 Notaviva Vineyards, LLC
NOTAVIVA® and WINE PAIRED WITH MUSIC. POUR. LISTEN. BELIEVE.®
are registered trademarks of Notaviva Vineyards LLC.
Unauthorized use is strictly prohibited.

Learn more about doing business
in Loudoun County, Virginia