« Construction Daily | Main | Construction Daily » April 29, 2007Construction DailyToday Shannon continued painting trim, and I began working on the master suite sinks. Part of the final inspection will be "finished surfaces" in some key places, namely under the sinks and the top deck of the jacuzzi tub. The sides don't have to be finished but the tops have to be tiled and grouted. Given the small space it was pretty easy to get it done in a couple hours, so now Fred can set the sinks on Monday. While Shannon was finishing up the trim I unpacked the new range hood and got it test fit. Looks like I'll need to boy some different ducting that what I had originally planned, but no big deal that stuff is pretty cheap. Got done in the house and went back out to the vineyard to hammer up two more rows of trellis wire. Daily hours (S&S combined) = 16 Posted by Stephen at April 29, 2007 11:01 PM |
|
Notaviva Vineyards, LLC
13274 Sagle Rd
Purcellville, VA 20132
Tel: (540) 668-6756
Copyright © 2007-2011 Notaviva Vineyards, LLC
NOTAVIVA® and WINE PAIRED WITH MUSIC. POUR. LISTEN. BELIEVE.®
are registered trademarks of Notaviva Vineyards LLC.
Unauthorized use is strictly prohibited.

Learn more about doing business
in Loudoun County, Virginia