« Construction Daily | Main | Construction Daily » April 30, 2007Construction DailyVernon and Tim were onsite to begin work on the railings. I had hoped to do them myself but considering the looming May 9 deadline it just doesn't look possible. They got the two long sides of the catwalk done, and we are very happy with the design. It's always kind of tense wondering how a design will come together as it never looks the same in reality as in your head, but this is going to look great. Didn't want anything too fancy that wouldn't blend with the rest of the interior architecture, thus I took more of a "deck" railing approach rather than a fancy Victorian-looking thing. Electricians managed to get the ceiling fans installed. That is a LONG way up (about 28' to the peak of the ceiling!) Posted by Stephen at April 30, 2007 11:02 PM |
|
Notaviva Vineyards, LLC
13274 Sagle Rd
Purcellville, VA 20132
Tel: (540) 668-6756
Copyright © 2007-2011 Notaviva Vineyards, LLC
NOTAVIVA® and WINE PAIRED WITH MUSIC. POUR. LISTEN. BELIEVE.®
are registered trademarks of Notaviva Vineyards LLC.
Unauthorized use is strictly prohibited.

Learn more about doing business
in Loudoun County, Virginia