« Construction Daily | Main | Construction Daily » April 8, 2007Construction DailyToday I focused on the music loft. Got the remaining side of the PA installed. This one was a lot harder than the previous one, basically because of the way I was wedged into the timber frame. Trying to hold the weight of the speaker with my left arm while trying to thread the shackle with my right was not fun, especially knowing a slip off the beam is a pretty long fall. Anyway, after looking like a dork for 15 minutes on national TV I got it installed. Then I got the LED lights installed. Mounted 8 up in the top beam. Once those were in I installed a piece of conduit so I could have clean cable runs up to the lights and center speaker. Pulled all the cable up (DMX for the lights, speaker cable, and power for the movie screen and lights.) Shannon came by for a few hours and dusted off her audio engineer skills and wired up the Neutrik speaker connectors! Daily hours (S&S combined) = 14 Posted by Stephen at April 8, 2007 10:29 PM |
|
Notaviva Vineyards, LLC
13274 Sagle Rd
Purcellville, VA 20132
Tel: (540) 668-6756
Copyright © 2007-2011 Notaviva Vineyards, LLC
NOTAVIVA® and WINE PAIRED WITH MUSIC. POUR. LISTEN. BELIEVE.®
are registered trademarks of Notaviva Vineyards LLC.
Unauthorized use is strictly prohibited.

Learn more about doing business
in Loudoun County, Virginia