Today I focused on the music loft. Got the remaining side of the PA installed. This one was a lot harder than the previous one, basically because of the way I was wedged into the timber frame. Trying to hold the weight of the speaker with my left arm while trying to thread the shackle with my right was not fun, especially knowing a slip off the beam is a pretty long fall. Anyway, after looking like a dork for 15 minutes on national TV I got it installed.
Then I got the LED lights installed. Mounted 8 up in the top beam. Once those were in I installed a piece of conduit so I could have clean cable runs up to the lights and center speaker. Pulled all the cable up (DMX for the lights, speaker cable, and power for the movie screen and lights.) Shannon came by for a few hours and dusted off her audio engineer skills and wired up the Neutrik speaker connectors!
Daily hours (S&S combined) = 14
Total hours = 406