« Construction Daily | Main | Blog Catchup » October 21, 2007Construction DailyWork continued today on the flooring underlayment. As with everything associated with this round tasting bar, the flooring is also turning out to be a major pain in the ass. Turns out I had to use the laser level to score lines in the floor, then create a paper template for the rather complex curved/angled pizza slice that becomes each flooring piece. You'll see what I mean in the pictures. Anyway, it took a while to figure out the proper design, then the process became transferring the shape of the template onto the Hardiboard, which then had to be cut one at a time with a jigsaw. And since this shit is basically made of concrete I can tell you it does wonders on saw blades. Basically I went through two jigsaw blades per piece. Fun. Tristan was on hand to distribute screws all over the universe, while Duncan cheered from the sidelines. Daily hours = 8 Posted by Stephen at October 21, 2007 7:37 PM |
|
Notaviva Vineyards, LLC
13274 Sagle Rd
Purcellville, VA 20132
Tel: (540) 668-6756
Copyright © 2007-2011 Notaviva Vineyards, LLC
NOTAVIVA® and WINE PAIRED WITH MUSIC. POUR. LISTEN. BELIEVE.®
are registered trademarks of Notaviva Vineyards LLC.
Unauthorized use is strictly prohibited.

Learn more about doing business
in Loudoun County, Virginia